PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued fixing the main steel column at the Monumental Stairs (2nd Floor) Facing South (800x600).jpg Continued installing the underground piping at the Boiler Room Facing South (800x600).jpg Continued laying out gravel at the Main Loby (102) Facing North (800x600).jpg Installing Stairs -2 Facing West (800x600).jpg Metal decking at Derricks 4-6 (4th Floor) Facing East (800x600).jpg Metal decking at the roof Facing South (800x600).jpg Started installing metal decking at the lower Roof Facing South (800x600).jpg Underground piping at the Boiler Room Facing North-West (800x600).jpg Welding the moment connections at the roof Facing East (800x600).jpg
Previous pageNext page Metal decking at Derricks 4-6 (4th Floor) Facing East (800x600)
Metal decking at Derricks 4-6 (4th Floor) Facing East (800x600)